GET A CONSULTATION RIGHT NOW
Close

"KHRABROVO" INDUSTRIAL PARK

GET A CONSULTATION RIGHT NOW
International airport
The only industrial park located in close proximity to the international airport.
Federal highway
Near industrial park «Khrabrovo» there is a federal highway A-217 (PrimorskyoeKoltso) of category 1b, which allows you to get to the largest transport hubs of the region and border crossing points in a short time.
Up to 30 years
Land in the Khrabrovo industrial park is leased to its residents for up to 30 years. The redemption right arises after three years from the date of signing the lease, but not earlier than the commissioning of the production (plant).
THE PARK IS OPEN FOR ALL TYPES OF PRODUCTION
ENGINEERING INFRASTRUCTURE
ELECTRIC SUPPLY
39 MW
proper substation
GAS SUPPLY
20 mln.m³ year
main gas pipeline
WATER SUPPLY, DRAINAGE AND SEWAGE
2500 sq.m. per day
water supply
2500 sq.m. per day
water disposal
DISTANCE
to the airport – 3 km
to Kaliningrad – 20 km
to the nearest cross border point – 65 km (Poland)
LAYOUT OF INDUSTRIAL ENTERPRISES
ON THE TERRITORY OF "KHRABROVO" INDUSTRIAL PARK
TRANSFORMER SUBSTATIONS
DISTRIBUTION SUBSTATIONS
POWER LINE AND POWER PLANT
HIGHWAYS
SEWER TREATMENT FACILITIES
DETAILED MAP OF COMMUNICATIONS
PARK TERRITORY
The cost of rent of 1 ha includes the following infrastructure
0,18 MW
GAS
WATER SUPPLY
POINT OF CONNECTION
TO NETWORKS
POINT OF CONNECTION
TO ELECTRIC NETWORKS
WITH A CAPACITY OF
1ha
DRAINAGE NETWORKS
TO DOWNLOAD THE SCHEME
The territory of the park consists of industrial land plots fully provided with engineering and road transport infrastructure and intended for the construction of production enterprises and warehouse complexes.

All industrial sites can be purchased in the property.
PREFERENCES FOR SPECIAL ECONOMIC ZONE REZIDENTS
CORPORATE INCOME TAX
As soon as the first payment received, but not later than 3 tax periods
PROPERTY TAX
For the first 6 years,
for the next 6 years – 1,1%
LAND TAX
For the first 5 years
REDUCED RATES
Of insurance contributions for payroll
More details
1. The SEZ regime applies to the entire territory of the region until December 31, 2045. Administration of the SEZ is carried out by the region.
2. Invariability of land rent
3. Non-application of measures, increasing the total tax burden
4. A simplified procedure for obtaining land for rent for the implementation of
investment projects
5. 0% — recycling fee for foreign machinery not older than 3 years on the
date of purchase
6. Minimum investment is 1 mln ₽ (for IT residents)

ADMINISTRATION OF THE SPECIAL ECONOMIC ZONE IN THE KALININGRAD REGION

LAND PLOTS
TERMS OF PROVISION
LAND PLOT RENT*
160 000 ₽
per year of 1 ha
Exemption period**
The price includes infrastructure costs
LAND PLOT RENT*
180 000 ₽
per year of 1 ha
After the exemption period
The price includes infrastructure
LAND PLOT SALE
2,9 mln ₽
of 1 ha

The sale price of land land
in the industrial park
The redemption right arises after three years from the date of signing the lease, but not earlier than the commissioning of the production (plant)
More details*
*This price includes:
• Land tax (leased land plot + share of common areas)
• Property tax (infrastructure)
• Infrastructure costs

The cost of rent of 1 ha includes the following infrastructure:
- point of connection to 0,18 MW electric networks
- point of connection to gas, water supply and drainage networks

**Exemption period is the period of design and construction of production (plant), but not more than 3 years from the date of conclusion of the lease agreement, the land plot is provided to the resident on preferential terms.


At the end of the exemption period, the land plot rent starts from 180 000 ₽ per year.
SERVICES
The Kaliningrad Region Development Corporation JSC is ready to accompany the project from the pre-project preparation stage to the commissioning of the facility.
DESIGN
- Selection of optimal points of connection to the engineering infrastructure;
- Control of design stages
1
EXPERTISE
Assistance in preparation of project documentation for submission for examination project
2
CONSTRUCTION PERMIT
Formation of a package of documents for obtaining a construction permit
3
PREPARATORY WORK
- Assistance in preparing the site for the start of construction and installation works;
- Providing the necessary engineering infrastructure for the construction period
4
CONSTRUCTION AND INSTALLATION WORKS
Assistance in the selection of a contractor for the implementation of construction and installation works, technical supervision; in choosing a supplier of building materials
5
COMMISSIONING
Formation of a package of documents for obtaining an act on putting an object into operation with an object cadastral registration
6
PRESENTATION OF THE PARK
BOOK A LAND PLOT
FILL IN 5 SMALL INFORMATION FIELDS BELOW IN TURN
BOOK A LAND PLOT
Name
Company
Phone number
Land plot area
Sanitary protection zone (meters)
Additional infrastructure parameters
PARTNERS
Contacts:
Email: office@kgd-rdc.ru
Phone: +7 (4012) 67-39-39
Address: st. Krasnaya, 63a, Kaliningrad, 236023
This website uses cookies to ensure you get the best experience
OK